Architectural Drawings for Lime Point (California)

240 Volt Service to Floodlights: Arrangement & Details (1882) (Lime Point Lt D-1)
A-N Control Panel: Panel Details (1882) (Lime Point Lt D-1)
A-N Control Panel: Panel Layout (1882) (Lime Point Lt D-1)
A-V Controler System: Interconnection Diagram (1882) (Lime Point Lt D-1)
A-V Controller & Lights: [14 of 27] Connection Diagram (1963) (Lime Point Lt D-1)
A.C. Power Distribution: Schematic and Wiring Diagram (1882) (Lime Point Lt D-1)
Access to West Side Floodlights: Arrangements & Details (Lime Point Lt D-1)
Coast Guard Boundary: Vicinity Map (Lime Point Lt D-1)
Control & Monitor Interface Panel: [1 of 2] Wiring Diagram (1959) (Lime Point Lt D-1)
Control & Monitor Interface Panel: Panel Layout (1950) (Lime Point Lt D-1)
Control & Monitor Interface Panel: Panel Layout Diagram (1950) (Lime Point Lt D-1)
Control & Monitor Link: Schematic Drawing (Lime Point Lt D-1)
Control Volume: [2 of 7] Elevations (1962) (Lime Point Lt D-1)
DCB-10 Rotating Optic: [3 of 7] Trouble Shooting Diagram (1960) (Lime Point Lt D-1)
ELG 300-02 Fog Signal Installation: [5 of 7] Arrangement & Details (1960) (Lime Point Lt D-1)
ELG 300-02 Fog Signal Installation: [6 of 7] Wiring Diagram (1960) (Lime Point Lt D-1)
ELG 300-02 Fog Signal Installation: [7 of 7] Wiring Diagram (1960) (Lime Point Lt D-1)
Electrical Alterations: [4 of 7] Elevations & Wiring Schematics (1960) (Lime Point Lt D-1)
Emergency Fog Signal Installation: [1 of 3] Arrangement & Details (1969) (Lime Point Lt D-1)
Engine - Generator Installation: [2 of 3] Plan, Elevations & Details (1969) (Lime Point Lt D-1)
Equipment Layout: [3 of 3] Plan & Elevation (1969) (Lime Point Lt D-1)
Exterior Restoration: Details (Lime Point Lt D-1)
Exterior Restoration: Elevations & Details (Lime Point Lt D-1)
F.S. Oscillator Mounting Platform: [2 of 3] Plan, Elevations & Sections (1961) (Lime Point Lt D-1)
Fence Addition & Door Replacement: [3 of 3] Plan & Elevation (1961) (Lime Point Lt D-1)
Fog Signal Building: Plan, Elevation & Section (1962) (Lime Point Lt D-1)
Fog Signal Installation: Elevations, & Details (1962) (Lime Point Lt D-1)
Fog Signal Oscillator Sound Wall: [1 of 9] Fabrication & Installation (1973) (Lime Point Lt D-1)
Generator Special Control Panel: [2 of 9] Wiring Diagram (1973) (Lime Point Lt D-1)
Halon Fire Suppression System: [3 of 9] Schematic & Wiring Diagram (1973) (Lime Point Lt D-1)
Halon System Installation: [4 of 9] Details (1973) (Lime Point Lt D-1)
Install 400 W M-V Floodlights: [5 of 9] Elevation & Details (1973) (Lime Point Lt D-1)
Keepers Dwelling: [6 of 9] Plan, Elevations & Sections (1973) (Lime Point Lt D-1)
Lamp Project: [2 of 7] General Plan & Wiring Diagrams (1968) (Lime Point Lt D-1)
Lamp Project: [3 of 7] General Plan & Misc. Details (1968) (Lime Point Lt D-1)
Lamp Project: [5 of 7] Structural Tube & Platform Details (1968) (Lime Point Lt D-1)
Lamp Project: [7 of 9] General Plan & Wiring Diagrams (1973) (Lime Point Lt D-1)
Lamp Project: [8 of 9] General Plan & Misc. Details (1973) (Lime Point Lt D-1)
Lamp Project: [9 of 9] Structural Tube & Platform Details (1973) (Lime Point Lt D-1)
Lantern Mounting Details: [6 of 7] Lantern Mounting Bracket Details (1968) (Lime Point Lt D-1)
Light & F.S. Control & Monitoring: [1 of 2] Wiring Diagram (1974) (Lime Point Lt D-1)
Light & F.S. Control & Monitoring: [7 of 7] Wiring Schematic (1968) (Lime Point Lt D-1)
Load Center & Compressor Controls: [1 of 2] Wiring Diagrams (1974) (Lime Point Lt D-1)
Map of Lime Point: Map Showing Location of Fog Signal (1976) (Lime Point Lt D-1)
NAVAID Sensor Module Panel: [1 of 2] Interconnect Diagram & Wire Run (1981) (Lime Point Lt D-1)
New Fog Signal & Generator: [2 of 2] Plan, Elevation & Details (1981) (Lime Point Lt D-1)
Oscillator Panel & Transistor Inv.: [03 of 14] Wiring Diagrams (Lime Point Lt D-1)
Overhead Power Lines: [04 of 14] Location of Power Lines (Lime Point Lt D-1)
Power Volume: [05 of 14] Elevations (Lime Point Lt D-1)
Proposed Steam Fog Signal: [06 of 14] Elevation & Section (Lime Point Lt D-1)
Rehabilitation & Maintainance: [06A of 14] Site Plan & Scope of Work (Lime Point Lt D-1)
Rehabilitation & Maintainance: [07 of 14] Cricket Details (Lime Point Lt D-1)
Relocate Fog Signals: [08 of 14] Arrangement & Details (Lime Point Lt D-1)
Remote Control Operation Console: [11 of 14] Console Arangement (Lime Point Lt D-1)
Remote Control Operation: [09 of 14] Schematic Wiring Diagram (Lime Point Lt D-1)
Remote Control Operation: [10 of 14] Wiring Diagram (Lime Point Lt D-1)
Remote Control System Panel: [12 of 14] Wiring Diagram (Lime Point Lt D-1)
Reorient Fog Signals: [13 of 14] Plan & Details (Lime Point Lt D-1)
Repair High Voltage Lines: [1 of 2] Repair Locations & Details (1988) (Lime Point Lt D-1)
Repair High Voltage Lines: [14 of 14] Repair Locations & Details (Lime Point Lt D-1)
Sections of Rock & Buildings: [2 of 2] Sections thru Lime Point (1988) (Lime Point Lt D-1)
Site Survey: [1 of 3] Site Map (1989) (Lime Point Lt D-1)
Solar Project: [1 of 3] Mount, Battery & Relay Enclosure (1989) (Lime Point Lt D-1)
Solar Project: [2 of 3] Plan & Photos (1989) (Lime Point Lt D-1)
Solar Project: [3 of 3] Structural Pipe & Platform Details (1989) (Lime Point Lt D-1)
Stand-by Generator System: [2 of 3] Interconnect Diagram (1989) (Lime Point Lt D-1)
SuperTyfon EA 150-225 Circuitry: [3 of 3] Wiring Diagram (1989) (Lime Point Lt D-1)
Supertyfon Installation: [1 of 3] Arrangement & Details (1991) (Lime Point Lt D-1)
Utility Map: [2 of 3] Location of Electric & Water Lines (1991) (Lime Point Lt D-1)
Voltage Reg. & Battery Charger: [3 of 3] (1991) (Lime Point Lt D-1)