Architectural Drawings for Turn Point (Washington)

25,000 Storage Tank Foundation: Elevation (1942) (Group Seattle I - 11)
Barn: [10] Elevations (Group Seattle I - 11)
Barn: [9] Elevations (Group Seattle I - 11)
Cistern and Pump Stand: Plan and Sections (1922) (Group Seattle I - 11)
Clutch Ring for Hoist: Section & Detail (1932) (Group Seattle I - 11)
Dock Extension & Hoist Repair: Bill of Materials, Details (1942) (Group Seattle I - 11)
Fire Escape: Sections and Elevations (1957) (Group Seattle I - 11)
Fog Signal Bldg: [1] Plan and Elevation (Group Seattle I - 11)
Fog Signal Bldg: [7] Elevations (Group Seattle I - 11)
Fog Signal Bldg: [8] Elevations (Group Seattle I - 11)
Fog Signal Setting Plan: Plan (1893) (Group Seattle I - 11)
Fuel Oil Storage Tank: As-built (1953) (Group Seattle I - 11)
Furnace Control: Wiring Diagram (1954) (Group Seattle I - 11)
Heat Zoning: Floor Plans (1959) (Group Seattle I - 11)
Install of AC Gen & Air Compressor: [1 of 3] Wiring Diagram (1958) (Group Seattle I - 11)
Install of AC Gen & Air Compressor: [2 of 3] Wiring Diagram (1958) (Group Seattle I - 11)
Install of AC Gen & Air Compressor: [3 of 3] Station Electrical Distribtion (1958) (Group Seattle I - 11)
Install of New Exhaust & Day Tank: Assembly, Elevation, Plan (1959) (Group Seattle I - 11)
Keeper's Dwelling: [2] Floor Plan (Group Seattle I - 11)
Keeper's Dwelling: [3] Elevations (Group Seattle I - 11)
Keeper's Dwelling: [4] Elevations (Group Seattle I - 11)
Keeper's Dwelling: [5] Elevations (Group Seattle I - 11)
Lens Assembly: [1 of 2] Lens Assembly (1925) (Group Seattle I - 11)
Lens Mounting: [2 of 2] Details (1925) (Group Seattle I - 11)
Mods for unattended operation: As-built (1974) (Group Seattle I - 11)
Mods for unattended operations: Plot Plan (1973) (Group Seattle I - 11)
Plot Plan and Utilities (1951) (Group Seattle I - 11)
Proposed Bldgs: Elevations (1891) (Group Seattle I - 11)
Proposed Keeper's Dwelling: Elevations (1891) (Group Seattle I - 11)
Proposed Light Tower: Elevations (1936) (Group Seattle I - 11)
Proposed Walk: Details (Group Seattle I - 11)
Propterty Disposal Map (1978) (Group Seattle I - 11)
Repairs to Carpenter Shop: Plans and Elevations (1958) (Group Seattle I - 11)
Tramway Rail Clamp: Detail (1919) (Group Seattle I - 11)
Triple Dwelling: [1 of 3] Floor Plan (1953) (Group Seattle I - 11)
Triple Dwelling: [2 of 3] Floor Plan (1953) (Group Seattle I - 11)
Triple Dwelling: [3 of 3] Floor Plan (1953) (Group Seattle I - 11)
Water System: Detail (1923) (Group Seattle I - 11)